9903.91.16

Notwithstanding heading 9903.91.14, effective with respect to entries, on or after January 10, 2027, of ship-to-shore gantry cranes, configured as a high- or low-profile steel superstructure and designed to unload intermodal containers from vessels with coupling devices for containers, including spreaders or twist-locks (provided for in subheading 8426.19.00), that: (1) are products of China; (2) that are manufactured, assembled or made using components, assemblies or subassemblies that are products of China; or (3) that are manufactured by a company or other entity that is owned or controlled by a Chinese person or legal entity, as specified by subdivision (l) of U.S. note 31 to this subchapter, that are attested by the importer as fulfilling in whole or in part an executed contract for sale dated prior to April 17, 2025 for goods that are entered for consumption, or withdrawn from warehouse for consumption, in the United States prior to April 18, 2027.

Back to search
Base rateThe duty provided in the applicable subheading
Section 301Not identified
Identified totalManual review
Research conditions—
Data update statusHTS · Checked within interval

Last successful check (UTC)

  • HTS ·

These are successful source-check times, not official publication or legal effective dates. No check record does not mean no data. Manually reviewed data has no automated freshness confirmation.

Data update status →

Sources and freshness

Effective period requires review · Not a filing determination

Referenced headings 9903.91.14

Official source 2026 HTS Revision 23 ↗

Published:

Rate details

Rate basis
Loading duty columns, Chapter 99 and dataset version…

Duty and fee estimate

Preliminary estimate
Fee schedule periodManual verification required
Selected entry date
2026-11-20
Recorded MPF schedule period
2026-10-01 – 2027-09-30

Schedules are maintained manually; a covered date does not mean the latest law has been verified. Confirm MPF exemptions, entry type and HMF conditions separately. This period applies only to the MPF schedule, not the validity of the HMF rate. Without a schedule, the amount is unknown, not zero.

Data update status →
Estimated identified duties and fees—

Shows identified duty, MPF and conditional HMF separately; this is not a filing amount.